Status
8 open roadmap items, 4 open pull requests and 1 open issue, read at Nov 18, 2026, 21:53 UTC from a062808.
The build reads the roadmap file and GitHub again after each commit and on a schedule.
Open work
Each row of a table of ROADMAP.md with an ID and a status that is not done. The build reads the file, so this list follows each commit.
8 of 8 open items
Blocked 1
| ID | Item | Status |
|---|---|---|
| W14 | The table check moves to its home | blocked |
In progress 2
Open 2
Later 3
No open item matches the filters.
10 items are done. Show the done items
| ID | Item | Status |
|---|---|---|
| W0 | The role of wirelab | done |
| W1 | The catalog tables | done |
| W2 | The use measures in @procedures/npm | done |
| W3 | The measure run | done |
| W4 | Repositories and their policies | done |
| W5 | The catalog on the site | done |
| W6 | Fault plans in rigor-chaos | done |
| W7 | The package rigor-proxy | done |
| W10 | Findings and the upstream ledger | done |
| W17 | HTTP faults for the alerts fault suite | done |
No done item matches the filters.
Pull requests
4 open pull requests, the most recently updated first.
Issues
1 open issue, the most recently updated first.